To watch in HD, get ClipCafe PRO
The excess tension was taken down
Please log in to add to collections.
Ancient Engineering

The excess tension was taken down into your small slender piers so everything could be...

The excess tension was taken down into your small slender piers so everything could be lifted upwards, could be lifted outwards. and the tension was taken down once without just collapsing in

Full Transcript

00:00:01.000 --> 00:00:02.061
The excess tension was taken down
00:00:02.061 --> 00:00:05.093
into your small slender piers so everything could be lifted
00:00:05.093 --> 00:00:08.127
upwards, could be lifted outwards. and the tension
00:00:08.127 --> 00:00:11.028
was taken down once without just collapsing in.
Duration
11 seconds
Views
23
Timestamp in Movie
00:23:16
Uploaded
May 24, 2025
Season
1
Episode
5
Genres
Production
AM Trading,Avatar Productions,Sutjeska Film

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

A fascinating look at how modern day structures and engineering technologies have been inspired by ancient discoveries.