Join the conversation
Log in or create an account to leave a comment
Log In
Essentially, the columns
weren't up to the job
that they were designed for, potentially putting
the building at risk
weren't up to the job
that they were designed for, potentially putting
the building at risk
Full Transcript
00:00:01.000 --> 00:00:04.601
Essentially, the columns
weren't up to the job
that they were designed for,
00:00:04.601 --> 00:00:07.201
potentially putting
the building at risk.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.