[narrator] As the community mourned, engineers knew they needed to fix this vital link and fast. [Bertha] I think they... they worked extra hard and made sure that the effort was all hands on deck, so that they could get it done. The bridge came down
September 15 and by November
the bridge was ready to go
and it was ahead of schedule
September 15 and by November
the bridge was ready to go
and it was ahead of schedule
Full Transcript
00:00:01.000 --> 00:00:02.791
[narrator] As the
community mourned,
00:00:02.793 --> 00:00:07.998
engineers knew
they needed to fix
this vital link and fast.
00:00:08.000 --> 00:00:11.999
[Bertha] I think they...
they worked extra hard
and made sure
00:00:11.008 --> 00:00:14.038
that the effort was
all hands on deck,
00:00:14.999 --> 00:00:15.518
so that they could
get it done.
00:00:15.633 --> 00:00:17.758
The bridge came down
September 15
00:00:17.833 --> 00:00:22.998
and by November
the bridge was ready to go
and it was ahead of schedule.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.