Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] As the top half is dug out, the exposed rock is covered with a thin layer of high performance concrete, shot from a hose at high velocity, aptly named shotcrete. The thin layer of shotcrete quickly compacts, and holds the earth in plac as it settles. With this technique, engineers
expect the ground to settle,
or deform a little
expect the ground to settle,
or deform a little
Full Transcript
00:00:01.000 --> 00:00:04.998
[narrator] As the top half
is dug out, the exposed
rock is covered
00:00:05.000 --> 00:00:07.718
with a thin layer of high
performance concrete,
00:00:07.072 --> 00:00:13.518
shot from a hose
at high velocity,
aptly named shotcrete.
00:00:13.056 --> 00:00:16.999
The thin layer of shotcrete
quickly compacts,
00:00:16.998 --> 00:00:18.998
and holds the earth in plac
as it settles.
00:00:20.048 --> 00:00:24.118
With this technique, engineers
expect the ground to settle,
or deform a little.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.