To watch in HD, get ClipCafe PRO
[narrator] As the top half is dug out, the exposed rock is covered
Please log in to add to collections.
Engineering Catastrophes

As the top half is dug out, the exposed rock is covered with a thin layer of high...

[narrator] As the top half is dug out, the exposed rock is covered with a thin layer of high performance concrete, shot from a hose at high velocity, aptly named shotcrete. The thin layer of shotcrete quickly compacts, and holds the earth in plac as it settles. With this technique, engineers
expect the ground to settle,
or deform a little

Full Transcript

00:00:01.000 --> 00:00:04.998
[narrator] As the top half is dug out, the exposed rock is covered
00:00:05.000 --> 00:00:07.718
with a thin layer of high performance concrete,
00:00:07.072 --> 00:00:13.518
shot from a hose at high velocity, aptly named shotcrete.
00:00:13.056 --> 00:00:16.999
The thin layer of shotcrete quickly compacts,
00:00:16.998 --> 00:00:18.998
and holds the earth in plac as it settles.
00:00:20.048 --> 00:00:24.118
With this technique, engineers expect the ground to settle, or deform a little.
Duration
25 seconds
Views
13
Timestamp in Movie
00:25:39
Uploaded
Oct 28, 2025
Season
6
Episode
3
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.