[narrator]
But investigators found
that for unknown reasons the steel inside
the foundation piles
had been replaced with shorter steel rods. As Luigi demonstrates. If you start to cut
or replace these rebars and use a new element
from top, then the strength
became insufficient
to connect the foundation with the base of the crane
But investigators found
that for unknown reasons the steel inside
the foundation piles
had been replaced with shorter steel rods. As Luigi demonstrates. If you start to cut
or replace these rebars and use a new element
from top, then the strength
became insufficient
to connect the foundation with the base of the crane
Full Transcript
00:00:01.000 --> 00:00:04.233
[narrator]
But investigators found
that for unknown reasons
00:00:04.299 --> 00:00:07.933
the steel inside
the foundation piles
had been replaced
00:00:08.000 --> 00:00:10.133
with shorter steel rods.
00:00:10.008 --> 00:00:13.999
As Luigi demonstrates.
00:00:13.999 --> 00:00:16.001
If you start to cut
or replace these rebars
00:00:16.001 --> 00:00:18.133
and use a new element
from top,
00:00:18.133 --> 00:00:21.933
then the strength
became insufficient
to connect the foundation
00:00:22.000 --> 00:00:24.001
with the base of the crane.