[narrator] Eventually, the work on the tunnel extension resumed, and in 2010, the metro finally opened in Carmel, connecting thousands of people daily with the heart of Barcelona. Where the ill-fated excavati is now just a distant memory If there is a lesson
to be learned from
this sink hole disaster, it's that the devil
is always in the details
to be learned from
this sink hole disaster, it's that the devil
is always in the details
Full Transcript
00:00:01.000 --> 00:00:04.205
[narrator] Eventually,
the work on the tunnel
extension resumed,
00:00:04.207 --> 00:00:08.645
and in 2010, the metro
finally opened in Carmel,
00:00:08.647 --> 00:00:13.045
connecting thousands
of people daily with
the heart of Barcelona.
00:00:13.001 --> 00:00:17.325
Where the ill-fated excavati
is now just a distant memory
00:00:18.527 --> 00:00:22.485
If there is a lesson
to be learned from
this sink hole disaster,
00:00:22.056 --> 00:00:25.805
it's that the devil
is always in the details.