Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] Four decades late nature had other ideas, and the ice, combined with freak winds brought the Honeymoon Bridg to its knees. Just months after the collapse, a commission was formed and plans for a new bridge drawn up. One that would be completely ice-flow proof. When the new bridge was built,
engineers stuck with
a steel arch design, but the big difference is that
the abutments are now around
twice as high above the river
engineers stuck with
a steel arch design, but the big difference is that
the abutments are now around
twice as high above the river
Full Transcript
00:00:01.000 --> 00:00:04.998
[narrator] Four decades late
nature had other ideas,
and the ice,
00:00:05.000 --> 00:00:09.558
combined with freak winds
brought the Honeymoon Bridg
to its knees.
00:00:11.056 --> 00:00:13.318
Just months after
the collapse,
00:00:13.032 --> 00:00:16.718
a commission was formed
and plans for a new bridge
drawn up.
00:00:16.072 --> 00:00:21.999
One that would be
completely ice-flow proof.
00:00:21.153 --> 00:00:26.158
When the new bridge was built,
engineers stuck with
a steel arch design,
00:00:26.016 --> 00:00:31.438
but the big difference is that
the abutments are now around
twice as high above the river.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.