Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] In all, three spans of the bridge were rebuilt. Much more robustly than before. And this time, the supporting piers were given extra protection with some defensive measure in the water below. We implemented dolphin docks
Full Transcript
00:00:01.000 --> 00:00:04.518
[narrator] In all,
three spans of the bridge
were rebuilt.
00:00:04.593 --> 00:00:06.638
Much more
robustly than before.
00:00:07.044 --> 00:00:08.978
And this time,
00:00:08.098 --> 00:00:11.478
the supporting piers
were given extra protection
00:00:11.553 --> 00:00:14.318
with some defensive measure
in the water below.
00:00:16.028 --> 00:00:18.238
We implemented dolphin docks.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.