[narrator] Nearly a year
after the collapse, work began on a new
retaining wall, downhill of the original. This time, more
than just gravity would hold it in place. [Jack] The original wall
is still here. And that provides
some additional support. But an additional
wall was built, and that wall
consists of pilings
that are drilled down, very deep, with sections
between the pilings
after the collapse, work began on a new
retaining wall, downhill of the original. This time, more
than just gravity would hold it in place. [Jack] The original wall
is still here. And that provides
some additional support. But an additional
wall was built, and that wall
consists of pilings
that are drilled down, very deep, with sections
between the pilings
Full Transcript
00:00:01.000 --> 00:00:03.003
[narrator] Nearly a year
after the collapse,
00:00:03.366 --> 00:00:05.005
work began on a new
retaining wall,
00:00:05.566 --> 00:00:07.004
downhill of the original.
00:00:07.004 --> 00:00:09.667
This time, more
than just gravity
00:00:09.667 --> 00:00:11.001
would hold it in place.
00:00:12.566 --> 00:00:14.003
[Jack] The original wall
is still here.
00:00:14.366 --> 00:00:16.005
And that provides
some additional support.
00:00:16.566 --> 00:00:19.167
But an additional
wall was built,
00:00:19.167 --> 00:00:23.267
and that wall
consists of pilings
that are drilled down,
00:00:23.267 --> 00:00:26.466
very deep, with sections
between the pilings.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.