NARRATOR: Not only was
the connection vulnerable, but if a leak did start, there was nothing to prevent
the water from eroding away the inside of the embankment, rendering the dam
structurally unsound
the connection vulnerable, but if a leak did start, there was nothing to prevent
the water from eroding away the inside of the embankment, rendering the dam
structurally unsound
Full Transcript
00:00:01.000 --> 00:00:03.433
NARRATOR: Not only was
the connection vulnerable,
00:00:03.005 --> 00:00:05.001
but if a leak did start,
00:00:05.002 --> 00:00:08.133
there was nothing to prevent
the water from eroding away
00:00:08.002 --> 00:00:09.799
the inside of the embankment,
00:00:09.899 --> 00:00:13.001
rendering the dam
structurally unsound.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.