[narrator] On the day
of the incident, [narrator] On the day
of the incident, the wind was gusting
between 22
and 30 miles per hour. So the crane wasn't actually
in operation. It was being lowered
to safety. If you've ever been
in downtown New York City, the winds inside
those street alleys
can be quite intense. So at this point, the operator
is just trying as quickly as possible to bring
this crane down
of the incident, [narrator] On the day
of the incident, the wind was gusting
between 22
and 30 miles per hour. So the crane wasn't actually
in operation. It was being lowered
to safety. If you've ever been
in downtown New York City, the winds inside
those street alleys
can be quite intense. So at this point, the operator
is just trying as quickly as possible to bring
this crane down
Full Transcript
00:00:01.000 --> 00:00:01.953
[narrator] On the day
of the incident,
00:00:01.953 --> 00:00:02.004
[narrator] On the day
of the incident,
00:00:02.433 --> 00:00:06.000
the wind was gusting
between 22
and 30 miles per hour.
00:00:07.233 --> 00:00:10.004
So the crane wasn't actually
in operation.
00:00:10.004 --> 00:00:13.999
It was being lowered
to safety.
00:00:13.001 --> 00:00:16.002
If you've ever been
in downtown New York City,
00:00:16.002 --> 00:00:20.433
the winds inside
those street alleys
can be quite intense.
00:00:20.499 --> 00:00:23.533
So at this point, the operator
is just trying as quickly
00:00:23.533 --> 00:00:26.633
as possible to bring
this crane down.