To watch in HD, get ClipCafe PRO
[narrator] Six concrete pier support seven spans
Please log in to add to collections.
Engineering Catastrophes

Six concrete pier support seven spans. Towards the center, the boxes arch upwards,...

[narrator] Six concrete pier support seven spans. Towards the center, the boxes arch upwards, creating a more than 650 foot wide, 130 foot high channel for shipping. Construction began in 1955. At the time, it was New Zealand's largest infrastructure project ever It took 1000 workers
four years to complete the mammoth structure, using more than 40,000 tons
of concrete and nearly 6000 tons of stee [narrator] When it opened, the four lane bridge was the North Island's longest crossing, and it was quickly put to work. It became pretty much
the only main road that links the north
of New Zealand with the south of New Zealan [narrator] But within a decade, it was clear New Zealand's largest bridg wasn't big enough. The initial amount of traffic
going over the bridge was about 10, 15,000 vehicles
per day, which was substantial

Full Transcript

00:00:01.000 --> 00:00:04.478
[narrator] Six concrete pier support seven spans.
00:00:04.553 --> 00:00:07.718
Towards the center, the boxes arch upwards,
00:00:07.072 --> 00:00:10.758
creating a more than 650 foot wide,
00:00:10.076 --> 00:00:14.198
130 foot high channel for shipping.
00:00:15.088 --> 00:00:19.038
Construction began in 1955.
00:00:19.113 --> 00:00:21.438
At the time, it was New Zealand's largest
00:00:21.044 --> 00:00:24.999
infrastructure project ever
00:00:24.153 --> 00:00:26.798
It took 1000 workers four years to complete
00:00:26.873 --> 00:00:27.998
the mammoth structure,
00:00:28.000 --> 00:00:30.398
using more than 40,000 tons of concrete
00:00:30.004 --> 00:00:33.003
and nearly 6000 tons of stee
00:00:33.012 --> 00:00:35.398
[narrator] When it opened, the four lane bridge
00:00:35.004 --> 00:00:38.997
was the North Island's longest crossing,
00:00:38.999 --> 00:00:41.238
and it was quickly put to work.
00:00:41.024 --> 00:00:44.718
It became pretty much the only main road
00:00:44.793 --> 00:00:46.438
that links the north of New Zealand
00:00:46.044 --> 00:00:48.358
with the south of New Zealan
00:00:48.036 --> 00:00:50.003
[narrator] But within a decade, it was clear
00:00:50.998 --> 00:00:53.398
New Zealand's largest bridg wasn't big enough.
00:00:53.044 --> 00:00:55.318
The initial amount of traffic going over the bridge
00:00:55.032 --> 00:00:58.438
was about 10, 15,000 vehicles per day,
00:00:58.513 --> 00:00:59.984
which was substantial.
Duration
61 seconds
Views
17
Timestamp in Movie
00:35:51
Uploaded
Oct 28, 2025
Season
6
Episode
1
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.