[narrator] Studying the wreckage, William's team quickly uncovered a problem, a lack of shoring poles to support the partly-built structure. The shoring was designed
by the engineer to hold the entire structure,
all six floors up
by the engineer to hold the entire structure,
all six floors up
Full Transcript
00:00:01.000 --> 00:00:02.318
[narrator] Studying
the wreckage,
00:00:02.032 --> 00:00:06.158
William's team quickly
uncovered a problem,
00:00:06.016 --> 00:00:10.718
a lack of shoring poles
to support
the partly-built structure.
00:00:10.072 --> 00:00:12.998
The shoring was designed
by the engineer
00:00:13.999 --> 00:00:16.038
to hold the entire structure,
all six floors up.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.