[narrator] Taking a full yea By 1986, the second bridge fix was complete, but it was more of a band ai than a permanent solution. Every repair adds more weight,
but add too much and the fixes would start
to overload the bridge, essentially making its problems worse. The latest fix alone involves
75 miles of new welds and 200,000 new bolts
adding unanticipated weight to a structure that's now
five decades old
but add too much and the fixes would start
to overload the bridge, essentially making its problems worse. The latest fix alone involves
75 miles of new welds and 200,000 new bolts
adding unanticipated weight to a structure that's now
five decades old
Full Transcript
00:00:01.000 --> 00:00:04.078
[narrator] Taking a full yea
By 1986,
00:00:04.012 --> 00:00:07.078
the second bridge fix
was complete,
00:00:07.008 --> 00:00:10.998
but it was more of a band ai
than a permanent solution.
00:00:11.000 --> 00:00:14.398
Every repair adds more weight,
but add too much
00:00:14.004 --> 00:00:17.398
and the fixes would start
to overload the bridge,
00:00:17.004 --> 00:00:20.478
essentially making
its problems worse.
00:00:20.048 --> 00:00:25.238
The latest fix alone involves
75 miles of new welds
00:00:25.024 --> 00:00:30.118
and 200,000 new bolts
adding unanticipated weight
00:00:30.002 --> 00:00:33.997
to a structure that's now
five decades old.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.