Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] The bridge
was fixed and fully open
to traffic on August 2, 2021, less than three months
after the emergency closure. It was a feeling of relief
to have the bridge open, knowing that we had done
a good job in fixing it
was fixed and fully open
to traffic on August 2, 2021, less than three months
after the emergency closure. It was a feeling of relief
to have the bridge open, knowing that we had done
a good job in fixing it
Full Transcript
00:00:01.000 --> 00:00:06.133
[narrator] The bridge
was fixed and fully open
to traffic on August 2, 2021,
00:00:06.002 --> 00:00:10.003
less than three months
after the emergency closure.
00:00:10.003 --> 00:00:12.699
It was a feeling of relief
to have the bridge open,
00:00:12.699 --> 00:00:15.533
knowing that we had done
a good job in fixing it.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.