[narrator] The bridge was fixed and fully open to traffic on August 2, 2021
Please log in to add to collections.
Engineering Catastrophes

The bridgewas fixed and fully opento traffic on August 2, 2021, less than three...

[narrator] The bridge
was fixed and fully open
to traffic on August 2, 2021, less than three months
after the emergency closure. It was a feeling of relief
to have the bridge open, knowing that we had done
a good job in fixing it

Full Transcript

00:00:01.000 --> 00:00:06.133
[narrator] The bridge was fixed and fully open to traffic on August 2, 2021,
00:00:06.002 --> 00:00:10.003
less than three months after the emergency closure.
00:00:10.003 --> 00:00:12.699
It was a feeling of relief to have the bridge open,
00:00:12.699 --> 00:00:15.533
knowing that we had done a good job in fixing it.
Duration
17 seconds
Views
9
Timestamp in Movie
00:13:00
Uploaded
Oct 28, 2025
Season
6
Episode
4
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.