Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] This busy waterway
is subject to major floods, which ruled out building
a suspension bridge. Instead, engineers opted
for a tied-arch design. {\an8}A tied-arch bridge is like
an archer's bow on its side
is subject to major floods, which ruled out building
a suspension bridge. Instead, engineers opted
for a tied-arch design. {\an8}A tied-arch bridge is like
an archer's bow on its side
Full Transcript
00:00:01.000 --> 00:00:04.004
[narrator] This busy waterway
is subject to major floods,
00:00:04.467 --> 00:00:08.267
which ruled out building
a suspension bridge.
00:00:08.267 --> 00:00:13.166
Instead, engineers opted
for a tied-arch design.
00:00:13.166 --> 00:00:16.467
{\an8}A tied-arch bridge is like
an archer's bow on its side.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.