[narrator] To finally stabilize the ground, the tunnel and sink hole were infilled. Engineers drilled holes
down to the tunnel, and poured 40,000 tons
of concrete in to fill it
down to the tunnel, and poured 40,000 tons
of concrete in to fill it
Full Transcript
00:00:01.000 --> 00:00:03.878
[narrator] To finally
stabilize the ground,
00:00:03.953 --> 00:00:06.678
the tunnel and sink hole
were infilled.
00:00:06.068 --> 00:00:08.958
Engineers drilled holes
down to the tunnel,
00:00:08.096 --> 00:00:14.198
and poured 40,000 tons
of concrete in to fill it.