Engineering Catastrophes

To finally stabilize the ground, the tunnel and sink hole were infilled. Engineers...

[narrator] To finally stabilize the ground, the tunnel and sink hole were infilled. Engineers drilled holes
down to the tunnel, and poured 40,000 tons
of concrete in to fill it

Full Transcript

00:00:01.000 --> 00:00:03.878
[narrator] To finally stabilize the ground,
00:00:03.953 --> 00:00:06.678
the tunnel and sink hole were infilled.
00:00:06.068 --> 00:00:08.958
Engineers drilled holes down to the tunnel,
00:00:08.096 --> 00:00:14.198
and poured 40,000 tons of concrete in to fill it.
Duration
15 seconds
Views
11
Timestamp in Movie
00:31:11
Uploaded
Oct 28, 2025
Season
6
Episode
3
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.