[narrator] To hoist the cooling units
Please log in to add to collections.
Engineering Catastrophes

To hoistthe cooling units high into position,engineers would be usinga giant crawler...

[narrator] To hoist
the cooling units high into position,
engineers would be using
a giant crawler crane with a boom around
195 feet long, attached to a 370-foot arm
known as a luffing jib. attached to a 370-foot arm
known as a luffing jib

Full Transcript

00:00:01.000 --> 00:00:02.734
[narrator] To hoist the cooling units
00:00:02.734 --> 00:00:08.234
high into position, engineers would be using a giant crawler crane
00:00:08.301 --> 00:00:12.000
with a boom around 195 feet long,
00:00:12.000 --> 00:00:13.734
attached to a 370-foot arm known as a luffing jib.
00:00:13.734 --> 00:00:14.734
attached to a 370-foot arm known as a luffing jib.
Duration
16 seconds
Views
10
Timestamp in Movie
00:04:47
Uploaded
Oct 28, 2025
Season
6
Episode
6
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.