Join the conversation
Log in or create an account to leave a comment
Log In
[narrator] While the road
remained closed, Ted Kniazewycz was tasked
with the massive job of getting one
of the country's most
vital trucking routes up and running. The solution that was chosen
was to add capacity for about 180 feet
on the structure
remained closed, Ted Kniazewycz was tasked
with the massive job of getting one
of the country's most
vital trucking routes up and running. The solution that was chosen
was to add capacity for about 180 feet
on the structure
Full Transcript
00:00:01.000 --> 00:00:02.009
[narrator] While the road
remained closed,
00:00:02.009 --> 00:00:05.007
Ted Kniazewycz was tasked
with the massive job
00:00:05.007 --> 00:00:08.599
of getting one
of the country's most
vital trucking routes
00:00:08.599 --> 00:00:10.000
up and running.
00:00:11.233 --> 00:00:14.333
The solution that was chosen
was to add capacity
00:00:14.399 --> 00:00:17.001
for about 180 feet
on the structure.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.