Join the conversation
Log in or create an account to leave a comment
Log In
NARRATOR: Winter 2003, construction on the new High
Rhine Bridge was well underway, and it was undergoing a routine
inspection ahead of the planned holiday season shutdown
Rhine Bridge was well underway, and it was undergoing a routine
inspection ahead of the planned holiday season shutdown
Full Transcript
00:00:01.000 --> 00:00:03.499
NARRATOR: Winter 2003,
00:00:03.499 --> 00:00:07.967
construction on the new High
Rhine Bridge was well underway,
00:00:07.967 --> 00:00:11.002
and it was undergoing a routine
inspection ahead of the planned
00:00:11.266 --> 00:00:13.067
holiday season shutdown.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.