Join the conversation
Log in or create an account to leave a comment
Log In
Next, the old bridge would be demolished, and the remaining
half of the new bridge would be built, accommodating four lanes
of traffic in total
half of the new bridge would be built, accommodating four lanes
of traffic in total
Full Transcript
00:00:01.000 --> 00:00:03.199
Next, the old bridge would be
00:00:03.199 --> 00:00:06.333
demolished, and the remaining
half of the new bridge would be
00:00:06.399 --> 00:00:08.573
built, accommodating four lanes
of traffic in total.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.