So, the engineers went for something much more radical. [narrator] The plan was to attach two new bridges to the old bridge, one on each side, doubling its capacity from four to eight lanes. These so called clip bonds were a completely different type of bridge. Instead of the steel lattic of a truss, they're hollow steel boxes reinforced with internal rib known as orthotropic decks. Supported from the piers bel by giant steel wings. If you look at each wing,
you can actually see two vertical columns
coming up
you can actually see two vertical columns
coming up
Full Transcript
00:00:01.000 --> 00:00:05.645
So, the engineers went
for something much
more radical.
00:00:05.072 --> 00:00:08.645
[narrator] The plan was
to attach two new bridges
00:00:08.687 --> 00:00:11.765
to the old bridge,
one on each side,
00:00:11.084 --> 00:00:16.245
doubling its capacity
from four to eight lanes.
00:00:16.247 --> 00:00:20.845
These so called clip bonds
were a completely different
type of bridge.
00:00:20.847 --> 00:00:23.565
Instead of the steel lattic
of a truss,
00:00:23.567 --> 00:00:27.965
they're hollow steel boxes
reinforced with internal rib
00:00:27.967 --> 00:00:30.885
known as orthotropic decks.
00:00:30.887 --> 00:00:35.605
Supported from the piers bel
by giant steel wings.
00:00:35.068 --> 00:00:38.001
If you look at each wing,
you can actually see
00:00:38.127 --> 00:00:39.845
two vertical columns
coming up.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.