Join the conversation
Log in or create an account to leave a comment
Log In
The pre-stressed concrete
bridge was completed in 2004 at a cost of around
$10 million
bridge was completed in 2004 at a cost of around
$10 million
Full Transcript
00:00:01.000 --> 00:00:03.006
The pre-stressed concrete
bridge was completed in
00:00:03.667 --> 00:00:08.166
2004 at a cost of around
$10 million.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.