To watch in HD, get ClipCafe PRO
The pre-stressed concrete bridge was completed in
Please log in to add to collections.
Engineering Catastrophes

The pre-stressed concretebridge was completed in 2004 at a cost of around$10 million

The pre-stressed concrete
bridge was completed in 2004 at a cost of around
$10 million

Full Transcript

00:00:01.000 --> 00:00:03.006
The pre-stressed concrete bridge was completed in
00:00:03.667 --> 00:00:08.166
2004 at a cost of around $10 million.
Duration
9 seconds
Views
13
Timestamp in Movie
00:35:24
Uploaded
Oct 28, 2025
Season
6
Episode
7
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.