To watch in HD, get ClipCafe PRO
They lined the joints or seams with molten lead, and as
Please log in to add to collections.
Engineering Catastrophes

They lined the joints or seamswith molten lead, and as it cooled and hardened,it should...

They lined the joints or seams
with molten lead, and as it cooled and hardened,
it should have created a watertight barrier

Full Transcript

00:00:01.000 --> 00:00:04.633
They lined the joints or seams with molten lead, and as
00:00:04.007 --> 00:00:07.009
it cooled and hardened, it should have created
00:00:08.000 --> 00:00:09.533
a watertight barrier.
Duration
11 seconds
Views
13
Timestamp in Movie
00:30:42
Uploaded
Oct 28, 2025
Season
6
Episode
9
Genres
Production
Moviecoop

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

With access to all phases of design and a large cast of experts, some of the great failures of engineering history are uncovered.