Join the conversation
Log in or create an account to leave a comment
Log In
NOW THEY INSTALL THE GAS LINES. THE STOVE, THE FRIDGE,
AND THE HEATING SYSTEM ALL RUN ON PROPANE. NEXT COME THE WATER
AND SEPTIC TANKS, MADE OF POLYETHYLENE,
A HEAVY-DUTY PLASTIC. THEY CUT A HOLE IN EACH TANK
AND SCREW ON A FITTING
AND THE HEATING SYSTEM ALL RUN ON PROPANE. NEXT COME THE WATER
AND SEPTIC TANKS, MADE OF POLYETHYLENE,
A HEAVY-DUTY PLASTIC. THEY CUT A HOLE IN EACH TANK
AND SCREW ON A FITTING
Full Transcript
00:00:01.000 --> 00:00:03.482
NOW THEY INSTALL THE GAS LINES.
00:00:03.482 --> 00:00:05.896
THE STOVE, THE FRIDGE,
AND THE HEATING SYSTEM
00:00:05.896 --> 00:00:08.689
ALL RUN ON PROPANE.
00:00:11.000 --> 00:00:13.482
NEXT COME THE WATER
AND SEPTIC TANKS,
00:00:13.482 --> 00:00:17.999
MADE OF POLYETHYLENE,
A HEAVY-DUTY PLASTIC.
00:00:17.999 --> 00:00:21.000
THEY CUT A HOLE IN EACH TANK
AND SCREW ON A FITTING.
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
Television series that documents how various everyday products are made.