To watch in HD, get ClipCafe PRO
Close the outer door valve
Please log in to add to collections.
Ice Station Zebra

Close the outer door valve. Control, number one tube open to sea. Shut the vents. Blow...

Close the outer door valve. Control, number one tube open to sea. Shut the vents. Blow main ballast.
Emergency

Full Transcript

00:00:01.000 --> 00:00:02.959
Close the outer door valve.
00:00:03.046 --> 00:00:07.046
Control, number one tube open to sea.
00:00:07.548 --> 00:00:09.799
Shut the vents. Blow main ballast. Emergency.
Duration
11 seconds
Views
81
Timestamp in Movie
01:03:29
Uploaded
Jan 24, 2025
Production
Filmways Pictures,Metro-Goldwyn-Mayer

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

USN nuclear sub USS Tigerfish must rush to the North Pole to rescue the staff of Drift Ice Station Zebra weather station.