To watch in HD, get ClipCafe PRO
Wanted the ceiling done
Please log in to add to collections.
Island of Bryan

Wanted the ceiling done, I wanted to have all the tiledone, I wanted this done but this,...

Wanted the ceiling done, I wanted to have all the tile
done, I wanted this done but this, we're still waiting for Derek to
finish on the electrical, and that is just
holding everything up

Full Transcript

00:00:01.000 --> 00:00:02.233
Wanted the ceiling done,
00:00:02.367 --> 00:00:03.933
I wanted to have all the tile done, I wanted this done
00:00:04.066 --> 00:00:05.633
but this, we're still
00:00:05.766 --> 00:00:07.766
waiting for Derek to finish on the electrical,
00:00:07.899 --> 00:00:10.133
and that is just holding everything up.
Duration
10 seconds
Views
372
Timestamp in Movie
00:02:19
Uploaded
Jun 14, 2025
Season
2
Episode
3
Production
Corus Studios,Si Entertainment

Want This Clip in HD?

Upgrade for HD/4K downloads and unlimited access. Upgrade now →

Movie Summary

The Baeumler family relocates to the Bahamas with the hope of renovating and opening a beachfront resort.