Join the conversation
Log in or create an account to leave a comment
Log In
That could be plastic explosives He's showing it to us on purpose before he destroyed the surveillance cameras The Cross-Harbour Tunnel was built using the caisson method and made up of 15 double-tube segments Its total length is 1.86km Between the two vehicle tubes is an engineering tube for maintenance Along the Tunnel there are 15 emergency doors that connect the two vehicle tubes ls there a drainage system or air vent that we can use for an attack?
Full Transcript
00:00:01.000 --> 00:00:02.005
That could be plastic explosives
00:00:03.084 --> 00:00:04.005
He's showing it to us on purpose
00:00:04.005 --> 00:00:06.542
before he destroyed the surveillance cameras
00:00:06.542 --> 00:00:07.875
The Cross-Harbour Tunnel
00:00:07.875 --> 00:00:09.917
was built using the caisson method
00:00:09.917 --> 00:00:13.459
and made up of 15 double-tube segments
00:00:13.459 --> 00:00:15.005
Its total length is 1.86km
00:00:15.005 --> 00:00:17.005
Between the two vehicle tubes
00:00:17.005 --> 00:00:20.125
is an engineering tube for maintenance
00:00:20.125 --> 00:00:22.075
Along the Tunnel there are 15 emergency doors
00:00:22.075 --> 00:00:24.667
that connect the two vehicle tubes
00:00:24.667 --> 00:00:26.459
ls there a drainage system or
00:00:26.709 --> 00:00:28.084
air vent that we can use for an attack?
Want This Clip in HD?
Upgrade for HD/4K downloads and unlimited access. Upgrade now →
Movie Summary
When a terrorist who specializes in explosives takes hold of an underground tunnel, he threatens to kill hostages if his demands are not met.